Network and communications rooms
Switches, routers, firewalls, storage, and local servers may need enough test lead time to bridge short disturbances or complete a controlled shutdown. Review actual rack demand, available circuits, rack versus tower format, management connectivity, airflow, and whether an external test lead configuration is appropriate for the desired duration.
- Useful focus: measured watts and graceful shutdown
- Check: receptacle layout, network card support, maintenance access

